Carbonset
Search · Form CS-000

Popular

Electrical · Carbonset

Panel upgrades take a decision. Give them the options in writing.

Service upgrades, car chargers, generator hookups: the homeowner needs time and usually a second opinion at home. Carbonset keeps the quote in front of both of them.

Hands testing an open breaker panel, a pink carbon copy clipped to its door.

Where quotes go missing.

A panel upgrade often waits for two people to compare the scope at home. A total relayed over the phone does not explain the service work, the permit or the car charger circuit.

Put the options in writing and send both decision makers the same copy. The office can see when it was opened and call with the utility timing while the estimate is still being discussed.

A real quote.

EstimateOne option
Job siteBayside, NY
Valid for30 days
Deposit30% · $1,794.00

Panel replacement and a car charger circuit

ItemQtyPriceLine
200 A main panel, 40 spaces, breakers included1$3,400.00$3,400.00
EV charger circuit, 60 A, up to 50 ft1$1,680.00$1,680.00
Move 4 circuits to the new panel1$300.00$300.00
Electrical permit and inspection1$600.00$600.00
Total$5,980.00
White · customer copy
Typical quote$5,980.00 · panel and charger circuit
Lines4 lines, priced the way the customer reads them.
Follow-upTwo decision makers
See it on the board →

The cadence we'd start you on.

Two decision makers · starting point

  1. Day 2Email19:00To both contacts: your panel and charger options, side by side.
  2. Day 5Text18:30Did you both get a chance to look at the options?
  3. Day 9Call task17:00Call in the evening, when both of them are home.
Open this cadence →

When it gets busy.

Busy seasonMarch to June

If the job needs a utility disconnect, add the lead-time line so the install window on the quote is honest.

Spring brings the car charger and generator quotes, and most of them wait on a utility date. Put the lead time beside the work it holds up, and let the two-contact cadence carry the quote while you wait.

Wire coils and breakers on a truck tailgate with a yellow carbon copy.

Questions from electrical shops.

Can both decision makers see the same quote?

Yes. Send the same quote link to both contacts. They see the same current revision and the same options.

Where does the utility wait belong?

Put the lead time in the quote, beside the work that needs a disconnect. Do not leave an install date implied by a deposit button.

Can the customer choose the car charger circuit?

Yes. Give that scope its own option. The lines, total and deposit change together when the customer picks it.

Start with the two decision makers cadence.

Pick electrical when you sign up and it is loaded before your first quote.

Carbonset37 pages / Fictional brand / Demo site by Sumo Studios
Back to Sumo Studios

[] previous / next demo