GableworthDesign-Build · Cold Spring HarborStudioPlan a build

One studio, one contract

An architect and a builder under one roof since 2011, in a former boatyard shed at the head of the harbor.

The studio at dusk: a long shingled boatyard shed with a row of lit windows, the harbor and moored boats behind.
The shed at the head of the harbor, a little after five. The drawing room is the lit end.
Since 2011

The people who draw the house price it. The people who price it build it.

Ines Varga spent nine years drawing houses for other builders, then driving out to watch them get built a little wrong. Tom Reidy spent those years framing them, working from drawings that had never met a budget. In 2011 they put the drawing table in the same building as the saw, in a former boatyard shed in Cold Spring Harbor, and started taking work under one contract.

The idea has not changed. We take on two to four houses a year, which is the number we can walk every week. Fourteen people: four in the drawing room, two superintendents, six carpenters, an estimator and an accounts lead.

One contract

One place to take a question.

OwnerONE CONTRACTGABLEWORTHDrawing roomEstimatingSiteExcavationConcretePlumbingElectricHeating, coolingRoofingMasonryEvery trade insured, its paperwork kept with the job.
Six rules at the drawing table
  1. 01

    Walk before drawing

    The first useful line is the lot line. The survey and test pit come before a room schedule.

  2. 02

    Price while drawing

    The people pricing the set sit beside the people drawing it. A change is shown with its number.

  3. 03

    Keep one contract

    We hold the drawings, the price and the subcontracts. There is one place to take a question.

  4. 04

    Stay on the site

    Two to four houses a year is the number the team can walk every week.

  5. 05

    Make choices in time

    Selections have a due date, an allowance and a price. Samples are seen in daylight.

  6. 06

    Keep the record

    A Friday photo log, a signed change and an inspected milestone make the job legible after the week has passed.

People

Nine of the fourteen you will meet.

Architect / co-founder

Ines Varga

Walks every lot before the first line. Draws the first sheet herself.

Ask about the first sheet and the site.Since 2011
Builder / co-founder

Tom Reidy

Signs every contract and countersigns every change order.

Ask about the frame and the fixed price.Since 2011
Architect

Priya Kell

Takes the sets through the town, the trustees and the district reviews.

Ask about approvals and the details.Since 2016
Estimator

Sam Ortiz

Prices the first sheet, and every change the same afternoon it is drawn.

Ask about what moves the number.Since 2014
Superintendent / North Shore

Dana Whitlock

One house at a time, from the first stake to the keys.

Ask about the work on site.Since 2013
Superintendent / East End

Luis Amaral

Runs Creek House now. Posts the photographs every Friday.

Ask about the friday photo log.Since 2015
Selections and client portal

June Haddad

Lays out the samples on the first and third Saturday of the month.

Ask about samples and decision dates.Since 2018
Carpentry / shop

Cole Brennan

Builds the stairs, the window seats and the benches in the shop.

Ask about stairs and millwork.Since 2017
Accounts

Ruth Okafor

Sends each draw when its milestone is inspected, never before.

Ask about draws and allowance differences.Since 2016

No portraits here. You will meet everyone on site.

The yard and the shop

What waits behind the shed.

Cedar shingle waits in the yard for six weeks before it goes up, so it settles. Bluestone is picked slab by slab and stood on edge in the rack. White oak is stickered and dried before the shop turns it into stairs, cabinets and window seats.

Why the cedar waits six weeks
The yard behind the shed: cedar shingle bundles under an open timber lean-to, bluestone slabs on edge in a rack and stickered oak boards.
The yard on a wet morning: cedar under the lean-to, bluestone on edge in the rack, oak stickered to dry.
White cedar shingle weathered to silver grey.
White cedar shingle, after the yard
Thermal-finished bluestone, a flat grey-blue surface.
Thermal-finished bluestone
Rift-sawn white oak boards with a straight grain.
Rift-sawn white oak, before the stair
Material samples laid out on a plan table in the drawing room.
The selections room on a Saturday morning: samples out on the plan table.

The selections room

On the first and third Saturday of the month, June lays the samples out on the long table under the north windows: stone wet and dry, oak oiled and raw, three whites on painted boards. Clients come with their portal open and leave with decisions dated.

What we do not do
  • Spec houses. Every house has an owner before it has a drawing.
  • Projects without a survey. We will pay for the survey before we guess.
  • Work outside our area. Glen Cove to Southold and the South Fork villages.
  • Someone else's finished drawings. Unless the price is still open.
Careers

Superintendent, East End

Full time, based in Southold. Eight or more years running residential jobs. You read drawings before you read email.

Finish carpenter

Full time, the Cold Spring Harbor shop. Show us a stair you built.

Write to careers@gableworth.example with the last thing you built.

Come and see the shed.

The drawing room is open Monday to Friday, 8:00 to 17:00. Samples are out on the first and third Saturday of the month.

Gableworth Design-Build30 pages / Fictional brand / Demo site by Sumo Studios
Back to Sumo Studios

[] previous / next demo