Laying out the plates.
Gableworth Design-Build30 pages / Fictional brand / Demo site by Sumo Studios
Start
Behind the counter
Small print
You asked on site on 24 September for a seat at the stair landing, where the morning light lands. The framing is open this week, which makes this the cheapest week to do it.
+2 working days to framing. The keys date does not move: the days fall inside the roofing float.
Added to Draw 4 (rough mechanicals). Nothing is due now.
Nothing on a change order is built until both signatures are on it.