FERROWRIGHTSend RFQQUOTE IN 1 DAY

FERROWRIGHT FABRICATION / HAUPPAUGE, NY

  1. 01Home
  2. 02Capabilities
  3. 03Parts catalog
  4. 04Industries
  5. 05Quality
  6. 06The shop
  7. 07Equipment
  8. 08Design guide
  9. 09Case studiesYOU ARE HERE
  10. 10Bracket configurator
  11. 11Request a quote
  12. 12Careers
  13. 13Questions buyers ask
  14. 14Contact and visit
  15. 15Customer login

QUOTE DESK / 631 555 0148 / MON TO FRI 07:00 TO 18:00 ET
180 KERF COURT / HAUPPAUGE, NY 11788

094 JOBS / 11 MEASURED CHANGES

Four jobs, with the numbers left in.

Customer names stay under NDA. The parts, the problems and the numbers do not.

BEFORE / AFTER, ACROSS ALL FOUR

TO FIRST ARTICLE
6 DAYS
FLATNESS
0.090 TO 0.030 IN
NEW SPEC
316
LEAD
9 TO 4 DAYS

EVERY RESULT

Before and after, in one table.

One number went up on purpose: the helm bracket costs 18% more in 316, and it stopped staining.

JOB / MEASUREBEFOREAFTER
Three revisions in nine days
Drawing to first article
15 days6 days
Three revisions in nine days
Rejected lots in 14 months
No record kept0
Three revisions in nine days
Unit cost after rev E
$86.40$76.90
Flat to 0.030 in over 24 in, after welding
Flatness
0.090 in0.030 in max
Flat to 0.030 in over 24 in, after welding
Scrap
8%1%
Flat to 0.030 in over 24 in, after welding
Cycle time
42 min31 min
From 304 to 316 after one season
Staining after one season
VisibleNone on the sampled brackets
From 304 to 316 after one season
Unit cost
$54.10$63.80
Twelve panels, one nest, four days
Lead
9 days4 days
Twelve panels, one nest, four days
Sheet use
61%83%
Twelve panels, one nest, four days
Price per panel
$41.20$35.40

What we show, and what stays under NDA.

SHOWN

The part. The material and thickness. The quantity. The problem. What we changed. The numbers before and after. The closest catalog part.

NOT SHOWN

Customer names and logos. Your drawings. Program names. Prices quoted to a named buyer.

Send a part like these and the estimator walks you through the closest job on a call, under your NDA.

QUOTE DESK / MON TO FRI 07:00 TO 18:00 ET

Put the difficult dimension on the quote.

The requirement that caused trouble last time belongs at the start of the next RFQ. Attach the current revision and the acceptance rule.

DRAWING IN BY 15:00 ET / A PRICED QUOTE THE NEXT BUSINESS DAY

Ferrowright Fabrication64 pages / Fictional brand / Demo site by Sumo Studios
Back to Sumo Studios

[] previous / next demo