FERROWRIGHTSend RFQQUOTE IN 1 DAY

FERROWRIGHT FABRICATION / HAUPPAUGE, NY

  1. 01Home
  2. 02Capabilities
  3. 03Parts catalog
  4. 04Industries
  5. 05Quality
  6. 06The shop
  7. 07EquipmentYOU ARE HERE
  8. 08Design guide
  9. 09Case studies
  10. 10Bracket configurator
  11. 11Request a quote
  12. 12Careers
  13. 13Questions buyers ask
  14. 14Contact and visit
  15. 15Customer login

QUOTE DESK / 631 555 0148 / MON TO FRI 07:00 TO 18:00 ET
180 KERF COURT / HAUPPAUGE, NY 11788

0716 MACHINES / 6 PROCESSES / MAKER AND MODEL ON REQUEST

Sixteen machines, listed by what they hold.

Tags match the travelers and the portal: when your job says FW-M03, this is the brake it ran on. Listed by class and rated capacity.

The 4 kW fiber laser cell after hours: shuttle table, sheet tower and a cut nest on the outgoing table
FIG. 08.1 / FW-M02 AND ITS LOAD TOWER

WILL IT RUN HERE

Check a material against the machines.

Pick a material, a thickness and what the part needs. Machines that can take it light up; the rest say why not.

MAINTENANCE

Saturdays are for the machines.

Preventive maintenance runs Saturday mornings, one machine class a week on a six-week rotation, so a weekday queue never loses a machine to a scheduled service.

ClassMachinesSaturday serviceLast doneNext
LasersFW-M01, FW-M02Optics, nozzles, chiller, bed slatsSAT OCT 10SAT NOV 21
BrakesFW-M03 to FW-M05Hydraulics, backgauge, crowning checkSAT OCT 3SAT NOV 14
Mills and latheFW-M06 to FW-M09Ways, spindle runout, probe calibrationSAT SEP 26SAT NOV 7
WeldersFW-M10 to FW-M12Leads, torches, electrode tipsSAT SEP 19SAT OCT 31
Press, deburr and powderFW-M13 to FW-M15Tooling, belts, booth filters, oven surveySAT SEP 12SAT OCT 24
CMMFW-M16Reference sphere, air bearingsSAT SEP 5SAT OCT 17

DOWN MORE THAN ONE SHIFT / THE QUEUE MOVES TO THE TWIN MACHINE, AND PORTAL DATES MOVE THE SAME DAY

NO TWIN (FW-M13, FW-M15, FW-M16) / THE ESTIMATOR CALLS EVERY BUYER WITH A DATE ON IT

Welder in a helmet running a MIG bead on a large plate, smoke drifting toward the high windows
FIG. 08.2 / WELD CELL 2, PULSE MIG

PARTNER STEPS

Steps we don't own, on our PO.

Heat treat, plating and anodize go to Long Island partners we have used for years. The quote names the step, the added days and the paperwork; you get one PO, one invoice and one box.

StepPartnerAdded daysIn your box
Heat treatPartner heat treater, Long Island+3 to +5Heat-treat cert with the lot
Zinc platingPartner finisher C+1Finish cert
Anodize, clear or blackPartner finisher A+3Finish cert, by batch
PassivationPartner finisher B+2Finish cert
ElectropolishPartner finisher B+4Finish cert
Panel legendsPartner printer+3Named on the quote
See where each machine sits on the floor

QUOTE DESK / MON TO FRI 07:00 TO 18:00 ET

Not sure it fits a machine? Send it anyway.

The estimator checks the envelope, the thickness and the tooling against your drawing, and calls the same day if something needs a partner.

DRAWING IN BY 15:00 ET / A PRICED QUOTE THE NEXT BUSINESS DAY

Ferrowright Fabrication64 pages / Fictional brand / Demo site by Sumo Studios
Back to Sumo Studios

[] previous / next demo